Cable Pulling and Installation Calculations

A cable route can be electrically perfect and still impossible to install. Pulling calculations check the tension and the sidewall pressure section by section, against the allowable stress for the conductor that is actually being installed, and tell you where the joints have to go. Get it wrong and the cable is damaged during installation, which nobody finds out about until it fails in service.

When You Need It

  • · A route has been set and the joint positions have not been proven installable
  • · An installer or manufacturer has issued a pulling study and it needs checking
  • · The route has tight bends, level changes or long straight sections and the tension is in question
  • · You want the number of joints reduced, because every joint is a cost and a failure point

Standards Applied

CIGRE TB 889IEC 60840Manufacturer limits

The report states the clause and the edition it works to, so the calculation can be reproduced by whoever reviews it.

What You Get

Pulling tension for each section, in both directions, so the better pull direction is chosen rather than assumed
Sidewall pressure at every bend, checked against the manufacturer’s limit
Joint and pulling section positions, optimised to reduce the joint count where the route allows it
Minimum bending radius and roller requirements stated for the installer
The allowable conductor stress used, with the material it belongs to named explicitly

That last point is not padding. On a 132 kV review we found a pulling study that had applied a copper allowable stress of 60 N/mm² to a 1000 mm² aluminium conductor, against a datasheet limit of 40 kN and a CIGRE TB 889 default for aluminium of 30 N/mm². Half again over the manufacturer’s own limit. The material the number belongs to matters more than the number.

Frequently Asked Questions

Can you reduce the number of joints on our route?

Often, yes. On a 6.1 km 33 kV route we took the pulling sections from 23 down to 13 by iterating the section lengths and pull directions, which took a large amount of work out of the installation.

What do you need to run a pulling calculation?

The route with its bends and level changes, the cable weight and diameter, the duct or trench arrangement, and the manufacturer’s allowable tension and sidewall pressure. If the allowable stress is not stated we will use the CIGRE TB 889 default for the conductor material and say so.

Will you check somebody else’s pulling study?

Yes, and it is worth doing. The inputs are where these go wrong, particularly the allowable stress and the assumed coefficient of friction.