When You Need It
- · A newly installed circuit has to be proved before energisation
- · A circuit has failed and the fault has to be located before anyone digs
- · Test results have come back and somebody has to say whether they are acceptable
- · An existing asset needs its condition assessed before it is relied on for more load
Standards Applied
The report states the clause and the edition it works to, so the calculation can be reproduced by whoever reviews it.
What You Get
Testing is arranged through a partner rather than performed with our own instruments. We are open about that. What we add is the interpretation, and the fact that the design calculations and the test results end up in the same hands.
Frequently Asked Questions
Do you carry out the testing yourselves?
No. It is delivered with our test partner. We scope it, attend where it is useful, and interpret the results.
Can you just interpret results somebody else took?
Yes, and that is a common request. Send the test records and the cable details and we will tell you what they mean.
The Rest of the Cable Chain
Review, calculation, drawings, testing and fault location, from one place. See the whole picture.