When You Need It
- · A cable system has been calculated but there is no drawing set to construct from
- · A civils package needs cable trench details, depths and separations it can price and build
- · Joint bay and sealing end arrangements have to be fixed before land or access is agreed
- · A bonding arrangement has been designed and needs a schematic with link box positions
Standards Applied
The report states the clause and the edition it works to, so the calculation can be reproduced by whoever reviews it.
What You Get
Drafting is brought in as the work requires it. We do not claim a standing in-house CAD department, and the engineering judgement on the drawings is ours.
Frequently Asked Questions
Can you work to our CAD standards and title blocks?
Yes. Say what layering, sheet sizes and title blocks you want and the set will be issued that way.
Do the depths and separations follow a particular document?
Street Works UK Volume 1 governs depths and proximity for work in the highway, and it is the separation of the asset being laid that the figures belong to, not its neighbour. That distinction gets confused often enough to be worth stating.